How It Works · Permit-Ready Design Process

Our Permit-Ready Design Process in Ontario

Getting permit drawings should not be confusing. At JMC Drafting & Design, our permit-ready design process gives Niagara and Ontario homeowners a clear path from first contact to drawings ready for the building department, with no guesswork, delays or surprises. Here is what happens at each step, and what it costs to get started.

Hidden-line Revit view of the front of a two-storey house, part of our permit-ready design process
Two-storey house Revit view
Step by step

Our Permit-Ready Design Process in 6 Steps

A step-by-step workflow built for code-compliant drawings and a smooth permit application, whatever you are building.

01

We respond within one business day

Send us your project details and we reach out by email or phone to confirm what you are planning and gather the information we need to get started.

02

Feasibility call

We talk through your goals, timeline and budget range, plus any ideas, challenges or limits that come with your property.

03

Zoning & building code review

When needed, we check your municipality's zoning bylaw and the Ontario Building Code to confirm what is allowed on your lot before design work begins.

04

A clear, written proposal

You get the scope, design stages, permit requirements, timeline and fees in plain language, so you know exactly what to expect.

05

Concept design to permit drawings

Once you approve the proposal, we develop your design concept with you, then prepare the full set of permit-ready drawings.

06

Permit submission (optional)

Want us to handle the paperwork? Our permit coordination service prepares and submits your application to the municipality for you.

Book your feasibility call →

Starting fees

Permit Drawing Starting Fees

Every project is different, so these are starting prices. Your written proposal (step 4) lists your full fee before any design work begins.

ADU Permit Design

$2,500 Starting price

ADU plans →

Home Addition Permit Design

$2,500 Starting price

Home addition plans →

Interior Remodeling Permit Design

$2,500 Starting price

Interior remodeling plans →

Custom Home Design

$6,000 Over 2,750 sq ft

Custom home plans →

Deck & Porch Permit Design

$800 Starting price

Deck & porch plans →

Accessory Structure Permit Design

$800 Starting price

Garage & shed plans →

Retroactive Permit Design

$800 Starting price

Retroactive permits →

Finished Basement Permit Design

$800 Starting price

Get a quote →

Permit Coordination & Submission

$200 Starting price

Get a quote →

Why it works

Why Our Permit-Ready Design Process Leads to Smoother Approvals

Every homeowner deserves drawings their municipality can approve without costly revisions. That is why our workflow is built around clear communication, accurate drawings and zoning checks at every stage. We catch potential issues before they reach the building department, not after.

Our BCIN-qualified designer keeps up with municipal bylaws, so each set of drawings reflects the current requirements where you live. Whether you are planning an ADU, a home addition, a garage conversion or a custom home, you get a predictable timeline and transparent pricing from your first call to your permit.

Before submission, we cross-check your drawings against the Ontario Building Code for structural, fire safety and accessibility requirements. Clients tell us this is why their permits are often approved on the first submission, saving weeks compared with working with a designer unfamiliar with local zoning bylaws.

Cutaway Revit view of a garden suite showing the kitchen, bathroom and sleeping area
Garden suite cutaway Revit model
Getting started

What to Have Ready Before Your Feasibility Call

You do not need everything on this list to get started, but the more you can share, the faster we can confirm what is allowed on your property and give you an accurate quote for your permit drawings.

Your property address

Your address tells us which municipality and zoning bylaw apply, so we can check setbacks, lot coverage and height limits for your lot.

A property survey, if you have one

A survey shows your lot lines and existing buildings. It helps us draw an accurate site plan, which most building departments ask for.

Photos of the existing space

Photos of your house, yard, basement or garage help us understand what is there today before we measure on site.

Your ideas, sketches or examples

A rough sketch, a Pinterest board or a picture of a home you like gives us a starting point for your concept design.

Budget range and timeline

Knowing your budget and when you hope to build helps us design something that fits, and plan the drawing schedule around your contractor.

Any letters from the city

If you received an order, a notice or past permit records from your municipality, share them. They are key for retroactive permit drawings.

Ready to start? Request your free quote →

The Ontario building permit process

What Happens After Your Permit Drawings Are Done

Permit-ready drawings are the biggest part of a building permit application in Ontario. Here is what typically happens next with your municipality's building department.

01

Permit application

Your drawings go to the building department with the application form and permit fee. We can submit it for you through our permit coordination service.

02

Plans review

A plans examiner checks your drawings against the zoning bylaw and the Ontario Building Code. Ontario sets maximum review times for complete applications, for example 10 business days for most house projects.

03

Comments, if any

The examiner may send comments or ask for more information before the permit is issued. Clear, complete drawings keep this step short.

04

Permit issued & inspections

Once the permit is issued, construction can start. The municipality inspects the work at set stages, such as footings, framing and final.

What affects how long the process takes?

Every project moves at its own pace. The main factors are the size and complexity of the project, whether zoning allows it as of right or needs a minor variance, how quickly design decisions are made, and how busy your municipality's building department is. Our feasibility call and zoning review (steps 2 and 3) are there to spot delays early.

FAQ

Questions About Our Permit-Ready Design Process

How quickly will I hear back after I contact you?

We respond within one business day by email or phone to confirm your project details and set up your feasibility call.

What is a feasibility call?

A conversation about your goals, timeline and budget range, and any challenges with your property. It helps confirm your project can move forward before you receive a proposal.

Do you check zoning before you start designing?

Yes, when your project needs it. We review your municipality's zoning bylaw and the Ontario Building Code first, so the design fits what is allowed on your lot.

How much do permit drawings cost in Ontario?

Our starting fees are $800 for decks, porches, accessory structures, retroactive permits and finished basements; $2,500 for ADUs, home additions and interior remodels; and $6,000 for custom homes over 2,750 sq ft. Your proposal lists your full fee before work starts.

Can you submit the permit application for me?

Yes. Our permit coordination and submission service starts at $200 and takes the paperwork off your plate.

Do I need a BCIN-qualified designer for my permit drawings?

Unless you draw your own plans, Ontario permit drawings for a house are usually prepared by a BCIN-qualified designer, an architect or an engineer. Learn about our BCIN qualification.

Can I start building before my permit is issued?

No. In Ontario, work that needs a building permit cannot start until the permit is issued. Building without one can lead to stop-work orders and fines, and you may need retroactive permit drawings later.

What if my project does not meet the zoning bylaw?

Sometimes a design can be adjusted to fit the rules. If not, many municipalities let you apply to the Committee of Adjustment for a minor variance. Our zoning review in step 3 tells you early whether this is likely, before you pay for full drawings.

Do I need a property survey for permit drawings?

A survey is very helpful because it shows your exact lot lines and existing buildings for the site plan. If you do not have one, mention it on your feasibility call and we will talk about the options for your property.

What areas do you serve?

Homeowners across the Niagara Region, including St. Catharines, Niagara Falls, Welland, Fort Erie and Niagara-on-the-Lake, as well as Greater Hamilton.

Free quote

Request a Permit Drawing Quote

Tell us about your project and we will get back to you with next steps and a price, usually within one business day. Prefer to talk? Call (905) 324-8065.

BCIN-qualified and fully insured

Drawn to the Ontario Building Code

Niagara and Greater Hamilton

get a free quote

✓ No obligation · Quotes usually go out within one business day.